27 trenes sin vías en Vietnam
Fecha de publicación: 4 de enero de 2026
Vietnam Theme Park Project – 27-Train Trackless Train
Project Success:
Completed installation of 27 customized trackless trains at Vietnam’s newest theme park
Full turnkey solution including vehicle design, theming, and control systems
Eco-friendly operation with electric-powered trains (6-8 hour battery life)
Custom theming to match park’s cultural storytelling elements
Key Specifications:
• Capacity: 27 passengers per train
• Operation: 14 hours/day continuous service
• Speed: Adjustable 5-12 km/h
• Safety: EN13814 certified with obstacle detection
Client Benefits Achieved:
✔ Increased park capacity by 300 visitors/day
✔ Reduced visitor fatigue with 40% faster transit between zones
✔ Became the park’s #1 Instagrammable attraction
Why We’re the Leading Trackless Train Supplier:
✓ 120+ train systems operating globally
✓ 10-year experience in Southeast Asian markets
✓ Modular designs allowing future capacity expansion
✓ Remote monitoring and predictive maintenance
Testimonial:
“The trains have transformed our visitor flow while becoming an attraction themselves. The supplier’s understanding of high-capacity operations was invaluable.”
Park Operations Manager
Our Trackless Train Solutions Include:
Custom length configurations (5-30 cars)
Themed vehicle designs
Charging station infrastructure
Staff training programs
Contact us for your people-mover solution!
Empieza hoy mismo tu propio proyecto de parque
¿Te ha inspirado esta implementación tan satisfactoria? Ponte en contacto con nuestro equipo de ingeniería para obtener un diseño de distribución en 3D gratuito, un cálculo preciso del volumen de envío y una evaluación del retorno de la inversión para tu instalación concreta.
Habla ahora mismo con un ingenieroCaso anterior: Nuevo punto de referencia en Nimo Highland
Siguiente caso: Noria en el Congo

